Projects
500+ Plants. Zero Compromise.
From 10 KLD pharmaceutical PW systems to 10 MLD industrial ZLD plants — every project engineered and operated to its exact specification.
Showing 12 of 12 projects

Textile ZLD Plant
99.2% water recovery. ₹1.8 Cr/year freshwater savings. PCB clearance obtained.

Pharmaceutical ETP
COD consistently ≤200 mg/L. API removal >99.5%. Zero MPCB notices in 2 years.

USP Purified Water System
0.06 µS/cm conductivity. USFDA-validated. Zero OOS incidents in 3 years.

5-Star Hotel MBR STP
Zero odour complaints in 3 years. 65 KLD reused daily. ₹22 lakh/year savings.

BOOT ETP — Pharma
Client avoided ₹3.8 Cr CAPEX. 99.3% uptime. Zero show-cause notices in 4 years.

Hyperscale Data Centre WTP
Cooling tower water consumption reduced 50%. Cycles of concentration: 3 → 6.5.

Smart IoT Rollout — 12 ETPs
Compliance exceedances reduced 94%. 3 pump failures predicted before occurrence.

Metro Depot ETP
Oil & grease: 1,200 → <5 mg/L. Heavy metals within CPCB limits. BMC consent obtained.

Food Processing WTP
River water to FSSAI-compliant process water. Zero FSSAI non-conformances in 2 years.

IT Park STP + Reuse
120 KLD recycled for cooling tower and landscape. ₹36 lakh/year savings.

Dyeing ETP with Ozone
Outlet colour: 3,800 → 280 Hazen units. TNPCB consent conditions met.

Smart City STP Network
Zero on-site operators. 98.6% uptime over 18 months. Remote-monitored from single dashboard.
Your project could be next.
Tell us your capacity, location, and compliance targets. We'll propose a system sized for your exact requirements.